Analyzing risk in your system is essential to ensuring optimal performance and meeting the expectations of your customers and investors. By evaluating current equipment through a physical inspection, you can develop a clear understanding of maintenance requirements and future equipment repairs and/or necessary replacements. You can also assess the risk involved in future loading requirements and obtain recommendations for system and equipment life extension.
In a typical Risk Analysis project Teshmont will:
Visit your facilities and assess existing equipment
Estimate future maintenance requirements and costs
Analyze viability of modifying and/or repairing existing equipment
Analyze viability of purchasing and installing new equipment
Make and prioritize system life extension recommendations
Create a comprehensive and easily decipherable report
Benefits you will gain from using Teshmont for Risk Analysis:
Knowledge and experience of proven experts
Reduction of risk and costs of unanticipated equipment or system problems
Improved system performance and increased equipment life
Increased system efficiency
Documentation for future reference
Teshmont worked with Teck Cominco to review the performance of the existing power system in Trail, BC. This ultimately led to the replacement of 63 kV substations. In New Zealand, Teshmont analyzed their existing 30 year old system and implemented recommendations to select voltage and modify equipment to accommodate the system upgrade.Teshmont conducted a Risk Analysis and Life Expectancy Study for BC Power for their DC system connecting the main land to Vancouver Island . Please refer to these projects for additional information on how Teshmont provided services to these facility owners and operators.