With today's steady advancement of technology
into the world of the electrical substation, it takes
a combination of multidisciplinary skills and experience
to deliver substation automation projects that meet
the diverse needs of today's utilities. The use of Intelligent
Electronic Devices (IEDs) and complex communication
networks can bring together unprecedented capabilities
in control, protection and monitoring of all of the
utilities power delivery systems. Development of new
standards, such as IEC 61850, and new technologies are
revolutionizing the way in which engineers design, implement
and test the next generation of substation automation
systems.
Teshmont has the “state of the art” skills,
tools and experience required to take your substation
automation vision from concept to reality.
For more information on Substation Automation
and Teshmont's services, please click
here to download our substation automation handout.
In a typical Substation Automation Project Teshmont will:
Help you to substantiate conceptual designs
Incorporate the latest available technologies
Carry out a feasibility study
Create detailed designs and specifications
Hold regular meetings to update you on project progress
Co-ordinate IED and HMI programming
Integrate products from different vendors
Perform or monitor factory testing
Provide real time simulation
Manage or support field commissioning
Create a post-project summary report
Benefits of using Teshmont for Substation Automation:
Gives you access to experts in substation automation
Inspires confidence to implement new ideas and technologies
Eliminates possible design deficiencies
Helps you to select optimal technological solutions within financial restraints
Reduces the risk of controls problems due to equipment deficiencies
Identification and elimination of existing programming “bugs”
Reduction of product integration issues
Commissioning service experience
Provides documentation for future reference
Teshmont recently helped Teck Cominco in the automation of
a new 63 kV substation with their Emerald
Switching Station project . This project not only added
efficiency to the system but has produced measurable results
in terms of increased reliability.