Teshmont provided the following services:
- Feasibility studies
- Harmonic filter studies
- Assistance with preparation of converter equipment and dc
submarine cable specifications
- Assistance with evaluating tenders
- Commissioning the dc system
- Transient studies for the dc line fault locator
- Studies of the dc transmission line to determine the clearances and insulation requirements for the uprated dc transmission line, which
included identification of towers which required modification
- Study of the insulation requirements and calculation of corona loss, RI, AN and electrical effects
- Assistance with investigations to extend the dc system to Auckland,
which included analyzing costs, voltage, rating and cable type for three HVDC transmission alternatives between the North and South Islands
- Developed replacement cost estimates for the New Zealand cable system
|