Teshmont’s scope was to develop a high level report covering the following:
Advantages of a multiterminal HVDC solution
Impacts of multiterminal HVDC configuration on the availability of the link
Challenges with a multiterminal solution
Minimum short circuit ratio for the converter in inverter operation
Necessary short circuit ratio to ensure fast recovery after commutation failure
Influence of the available short circuit capacity on the required recovery time after a commutation failure
Protection of the system against overvoltages caused by sudden disconnection of HVDC link due to failures
Estimated costs for the HVDC stations and transmission lines
Evaluation of the staging and upgrading of the HVDC System.
|