Featured Projects
Bakun-Sabah AC Interconnection
Egypt-Jordan Interconnection
Emerald Switching Station
Isle of Lewis Wind Farm
Wuskwatim Generating Station


Itaipu Transmission System


Eletrobras / Furnas


Brazil

     
 
 
The 12,600 MW Itaipu generating station, located on the Parana River on the border of Brazil and Paraguay, is jointly owned by Paraguay and Brazil. Half of the Itaipu generators operate at 60 Hz, the frequency of the Brazilian system, while the other half of the generators operate at 50 Hz, the frequency of the Paraguayan system. Most of the 6,300 MW from the 50 Hz generation is transmitted a distance of about 900 km to San Paulo using HVDC transmission with two bipolar circuits each rated at ±600 kV, 3150 MW. The remaining 6,300 MW from the 60 Hz generation is transmitted by three 765 kV lines to Brazil.  
 
   

Teshmont performed detailed system and design studies and prepared specifications for the project. Teshmont also carried out a “state of the art” study, to establish the most appropriate technology to transmit the power. This was followed by a feasibility study of alternative transmission systems including 500 kV, 765 kV, and 1000 kV ac, as well as ±600 kV dc. A technical and cost study of ac and dc transmission showed that transmission at 765 kV ac was the optimum alternative.

Following a decision to transmit half the power by dc, Teshmont carried out extensive system studies for a combined ac-dc transmission system with 6,300 MW transmission by HVDC and the remainder by 765 kV ac. Teshmont provided assistance with the preparation of converter specifications, tender evaluation, and design review.

Studies Teshmont conducted for this project include:

  • Integration and planning studies

  • Comprehensive load flow and stability studies

  • DC simulator studies to determine dc system performance requirements and amount of synchronous compensation/static var device support

  • AC and DC filter requirements to achieve acceptable limits of interference

  • Overvoltage studies
Teshmont prepared specifications for all equipment associated with the HVDC system, evaluated tenders, made recommendations to purchase and reviewed suppliers designs.