Teshmont provided the following services:
- Preparation of a functional specification which allowed either a conventional SVC or a STATCOM
- Bid evaluation
- Development of ac system equivalent models for use in the contractor’s studies
- Development of models for the existing Highgate HVDC converter station for use in studying the possible interaction between the STATCOM and the HVDC converter station
- Design review of the contractor’s electrical and civil designs
- Witnessing equipment factory tests for specialized equipment including the valves and converter transformers
- Assisting VELCO with system studies for the project
- Participating in the factory tests of the STATCOM control systems
- Assistance with commissioning the STATCOM
- Review of performance issues and control system optimization to meet the needs of the system
|