Case Studies - Teshmont: Leaders in Power Delivery Engineering

Case Studies

Owner’s Engineer
4 case studies
Engineering Design
4 case studies
Power System Studies
6 case studies
HVDC Systems
7 case studies
EHVAC Projects
4 case studies

Featured Case Studies

Manitoba Hydro Bipole III
Teshmont is the Owner’s Engineer for Manitoba Hydro on the Bipole III HVDC Converter Stations Project. This project includes the northern Keewatinohk converter station, ac switchyard, and electrode, and the southern Riel converter station, synchronous compensator facility, and electrode.
Client: Manitoba Hydro Region: Manitoba, Canada Categories: Owner’s Engineer, HVDC Systems